Konstruksi Xcmg Heavy Crawler Crane 300 Ton

Konstruksi Xcmg Heavy Crawler Crane 300 Ton

Detail produk:

Tempat asal: Cina
Nama merek: XCMG
Nomor model: XGC 300T

Syarat-syarat pembayaran & pengiriman:

Kuantitas min Order: Satu derek
Harga: Negotiable Price
Kemasan rincian: Pengemasan sesuai dengan kebutuhan pelanggan
Waktu pengiriman: Menurut konfirmasi pesanan
Syarat-syarat pembayaran: L/C,T/T
Menyediakan kemampuan: Pasokan sesuai dengan kebutuhan pelanggan
Harga terbaik Kontak

Informasi Detail

Maximum Travel Speed: 1.5 km/h Model: XGC300
Max. Luffing Jib Length: 96m Maximum Radius: 80 m
Max. Lifting Height: 140m Engine Power: 242kW
Maximum Line Speed: 120 m/min Operating Weight: 300,000kg
Max. Lifting Capacity: 300 tons Maximum Tip Height: 152 m
Max. Gradeability: 30% Max. Boom Length: 102m
Menyoroti:

konstruksi xcmg berat crawler crane

,

Xcmg Heavy Crawler Crane 300 Ton

Deskripsi Produk

XGC 300t ((-I) Crawler Crane Tower tipe Kondisi kerja tanpa utama boom pulley blok Di sudut 85 derajat Dan 115t 40t Kapasitas

XGC 300t ((-I) Spesifikasi teknis derek merangkak


Model derek merangkak: XGC 300t ((-I)
Kapasitas angkat maksimal: 300t
Momentum angkat maksimum: 1865t.m.

 

Kondisi kerja menara_Karakteristik hook utama boom menara tanpa blok katrol boom utama dan katrol tunggal boom menara (HW/1)

Kondisi kerja menara_jarak kerja hook utama boom menara tanpa blok katrol boom utama dan katrol tunggal boom menara (HW/1)

 

Konstruksi Xcmg Heavy Crawler Crane 300 Ton 0

Kondisi kerja menara_(HW/1) diagram rentang kerja lengan menara main hook tanpa blok katrol lengan utama dan katrol tunggal lengan menara

 

Kondisi kerja tipe menara_tidak ada blok pulley boom utama dan tower boom single pulley HW/1_85°_115t+40t_25m kinerja hook utama tower boom

 

Panjang balok utama ((m)

25

HW/1

Panjang lengan menara ((m)

Radian

24

30

36

42

48

54

◇60

☆66

(m)

t

t

t

t

t

t

t

t

12

100.0

 

 

 

 

 

 

 

13

98.0

 

 

 

 

 

 

 

14

95.1

82.6

 

 

 

 

 

 

15

92.9

81.1

70.4

 

 

 

 

 

16

90.7

79.5

69.3

 

 

 

 

 

17

85.8

77.9

68.1

59.0

 

 

 

 

18

83.9

76.3

67.1

58.3

 

 

 

 

19

75.9

73.7

66.0

57.5

51.5

 

 

 

20

72.0

70.9

65.0

56.9

49.5

42.7

 

 

22

65.2

63.8

60.8

55.3

48.4

41.9

34.7

 

24

58.7

58.2

55.9

54.0

47.4

41.2

34.2

28.1

26

51.4

52.8

52.5

50.4

45.7

40.4

33.7

27.8

28

 

48.2

47.9

46.7

44.0

39.9

33.4

27.5

30

 

44.2

43.9

43.5

42.3

39.6

32.9

27.1

32

 

38.4

40.5

40.1

39.5

39.0

32.4

26.8

34

 

 

36.7

37.1

36.9

35.0

32.0

26.3

36

 

 

32.6

34.7

34.4

32.5

30.1

25.6

38

 

 

28.6

32.0

32.0

30.3

29.7

23.8

40

 

 

 

29.3

29.9

28.4

29.2

23.1

42

 

 

 

25.8

28.0

26.6

27.3

22.3

44

 

 

 

22.9

25.6

25.2

25.7

21.8

46

 

 

 

 

24.2

23.7

24.1

21.0

48

 

 

 

 

20.9

22.4

22.8

20.4

50

 

 

 

 

18.7

21.2

21.7

19.5

52

 

 

 

 

 

19.8

20.0

18.4

54

 

 

 

 

 

18.1

17.3

17.1

56

 

 

 

 

 

 

17.0

16.2

58

 

 

 

 

 

 

15.6

15.2

60

 

 

 

 

 

 

14.1

14.1

64

 

 

 

 

 

 

 

12.0

 

Catatan:

1.◇--kombinasi menara-lengan membutuhkan tali pinggang 2,59m; ☆--kombinasi menara-lengan membutuhkan tali pinggang 3,58m. 2. Bagian boom utama perlu menghapus plat tarik belakang yang memperbaiki boom bantu,dan pengurang boom utama perlu memasang roda pemandu lengan menara.

3. Ketika mengangkat boom, silakan menempatkan roda penggerak merangkak di belakang tubuh kendaraan, dan disarankan untuk menggunakan derek bantu atau curug miring untuk membantu mengangkat boom.

 

Ingin Tahu lebih detail tentang produk ini
Konstruksi Xcmg Heavy Crawler Crane 300 Ton bisakah Anda mengirimkan saya lebih banyak detail seperti jenis, ukuran, jumlah, bahan, dll.
Terima kasih!
Menunggu jawaban Anda.